top of page
Bermondsey main.png

New build construction projects that involve fitting balconies often comes with a unique set of challenges that impacts efficiency and profitability affecting both the client and the main contractor.

 

Our revolutionary Triple S Balcony system has been designed to transform and simplify the way balconies are installed, saving time and costs while increasing safety and sustainability.

Manufacture to Installation

with our Triple S guarantee

Embassy Gardens-29.jpg

Exceeds all British Quality & Fire Standards

UKCA CE.jpeg
achilles .jpg
FORS silver.png
bsi.png
constructionline gold.jpg
considerate constructors.jpg

The innovative Triple S Balcony system is engineered to provide a “Safe-Simple-Sustainable” solution for modern balcony installations. Built to comply with the rigorous BS 8579 standard, this system integrates cutting-edge materials and structural design, making it an ideal choice for safe and long-lasting balcony construction.

 

Meeting CE Execution Class 3 standards, the Triple S Balcony system benefits from Alloy Fabweld's robust manufacturing processes and extensive industry experience, ensuring high-quality, load-bearing structural components certified under BS EN 1090-2:2018 and BS EN 1090-1:2009+A1:2011.

Non-Combustible Materials

Built with our own aluminium components, rated to fire safety standard A2-s1, d0, ensuring they resist ignition and spread of fire.

Independently Certified

The balcony system’s materials have undergone rigorous fire testing, including compliance with BS EN 13823, BS EN 13501, and BS EN ISO 1716 standards for optimal fire performance.

Enhanced Fire Protection

Triple S soffit cladding is designed to provide additional fire resistance, covering structural elements and minimising fire risks.

Long-Lasting Fire Safety Assurance

The system includes a 30-year warranty and a 60-year life expectancy, ensuring enduring fire protection over the balcony's lifespan​.

AFW_CW25-29.jpg

Faster, Safer & Secure Installation

A simple idea with a big impact

Our intuitive AFW Key Lock System and Guidance Cone allows balcony installation to be completed from the safety of the building, reducing unnecessary risk for the installation team.

Using the guidance cone, the balcony slides into place through the AFW key lock and locks it into position. This lines up the bolt holes and holds the weight of the balcony ready to be manually secured using M20 CE grade bolts.

SSS Fixed.png

M20 CE GRADE BOLTS

Secured into position with additional fixings for maximum safety.

AFW KEY LOCK SYSTEM

Key profiled into steel section to take guide cone.

MILD STEEL PLATE

Additional plate welded to folded plate for stiffness in bracket locations.

SSS Fixing-02.png

SLOTTED CONNECTIONS

Used in stub bracket for increased balcony tolerance.

GUIDANCE CONE

Preinstalled cone fixed to stub bracket for quicker installation of balcony modules

Kings Road Park.jpg
K1K2 AFW-01221.jpg
AFW_CW25-24.jpg

Optimised crane usage & dramatic cost savings

Balconies are easily lifted using pre-slung hooks and fixings, making them ready for immediate installation. Expert personnel inside the building skillfully maneuver the balcony into place, ensuring a smooth and secure glide. At the same time, attentive site workers clear sightlines while the crane swiftly prepares the next balcony for efficient installation. This innovative method allows balconies to installed from the ground up, significantly increasing installation speed!

AFW Green-4.jpg

Simple, safe & great for the planet too.

At Alloy Fabweld, sustainability is at the core of every stage of the Triple S Balcony System, from production to installation. This innovative approach combines cutting-edge green technology and eco-conscious design to minimise environmental impact while maximising durability. 

100% Green-Powered Manufacturing Facility

The Triple S Balcony System is manufactured at the UK’s first carbon-neutral, off-grid engineering facility in Essex, powered entirely by renewable energy sources.

Sustainable Sourcing & Materials

Materials are sourced within the UK to minimise transportation emissions and support local industries. All decking, balustrades, and soffit cladding are 100% recyclable.

Eco-Conscious Production Practices

On-site waste is meticulously sorted, with aluminium and steel offcuts recycled, reducing landfill impact. Water-saving measures and energy-efficient LED lighting reduce the facility’s environmental footprint​.

End-to-End Eco-Logistics

The FORS Silver certified lorry fleet ensures that transport aligns with eco-friendly practices, minimising emissions during product delivery.

SSS Fixing 2.png

Get in touch

Thanks for submitting!

bottom of page